Ft Jackson, SC
ithin 24 hours Simulator Documentation Each Simulator is fielded with an InstructorOperation Manual IOM and the additional reference data identified therein The IO will utilize the IOM and reference data set in the daily operations of each simulator as required The IO will identify corrections needed or shortfalls found in the IOM or in any of the reference data items as an addendum to the monthly performance report An entry is not required in the monthly report if no required updates have been identified for the IOM during th
2024-3-18